Kentron, Aghbyur Serob 50, Technotun

Kentron, Aghbyur Serob 50, Technotun

Price: No information available!

Developer Technotun
Main Contractor Bplan
 
Completion 2023 / Completed
Construction Period 2021 Mar - 2023 May
Total Development Area 13700
Income Tax Return
Yes
Functional Purpose Residential
Floors Above Ground 7
Floors Below Ground 2
Facade, Facing Black Tufa, Travertine
Total Apartments 78
Apartment Units
1BR77,2 m²
2BR108,5 m²
3BR121.7 + 176,5 (Տերասա), 126,6 m²
Parking 75
Ceiling Height (m) 3
Condition of Apartments for Sale
  • Internal partitions installed according to design, without internal finishing works
  • Floor screeding completed
  • Walls and partitions plastering completed
  • Electricity inputs to the apartments
  • Entrance door: high-quality door with metal base
  • Windows and external doors: high-quality aluminum sound / thermal insulated
  • Interfloor sound insulation
  • Renovated balconies
Elevators Service: 2 (Edunburgh) 1000kg
Natural Gas in Apartment No
Central Heating Yes
Central Cooling Yes
Centralized Water Heating Yes
Fire Protection System Yes
Video Surveillance System Yes
Access Control Italian BiTicino security and video surveillance system
Panoramic View Yes
Developer's Other Projects
Technodom residential building with modern architectural and technical solutions is located at 50 Aghbyur Serob Street, near Verin Antarain Street and Saralanj Avenue, Arabkir district Yerevan.

The newly built residential building has 2 entrances, which are designed according to modern security standards, equipped with necessary technical solutions. The monolithic building is completely thermally insulated with high-quality mineral wool. All apartments have an open balcony.

On the roof of the residential building, there is a modern green public space, where the residents of the building can organize their entertainment and enjoy the view of Yerevan, and in the courtyard there is a park with modern landscape solutions, where both adults and children can enjoy their safe rest.

Design (8)

Construction Progress (4)