Jrvezh, Jrvezh 17, Bagrevand Residence
Price: 600 000 - 600 000 AMD, depending on the floor and orientation
 |
Sales Representative |
D.G.A. Realty |
 |
Developer |
Elitar Shin |
| |
 |
Contact |
dga-realty@yandex.ru(37499) - 501020, (37491) - 551845, (37410) - 551845, (37410) - 551846 |
| |
|
Completion |
2025 / Completed |
|
Construction Period |
2023 Apr - 2025 Dec |
|
Total Development Area |
7325 m² |
|
Total Buildings |
1 |
|
Income Tax Return |
Yes
|
|
Playground |
The neighborhood will have its own green park and playground. |
|
Neighborhood Park |
2000 m² |
|
Functional Purpose |
Residential |
|
Floors Above Ground |
9-15 |
|
Floors Below Ground |
2 |
|
Facade, Facing |
Cerampgranite |
|
Total Apartments |
392
4%
96%
Sold (377) Available (15)
|
|
Apartment Units |
| SA | 35 m² | | 1BR | 52-66 m² | | 2BR | 69, 76 m² | | 3BR | 118 m² |
|
|
Parking |
208
25%
75%
Sold (156) Available (52)
|
|
Ceiling Height (m) |
3 |
|
Elevators |
Service: 8 |
|
Natural Gas in Apartment |
Yes |
|
Central Heating |
No |
|
Central Cooling |
No |
|
Centralized Water Heating |
No |
|
Fire Protection System |
Yes |
|
Video Surveillance System |
Yes |
|
Panoramic View |
Yes |
|
Other Key Features |
- The windows are aluminum with fire-resistant glass.
- The complex will be built with heat-insulating Technonikol materials.
- All apartments have open balconies.
- Solar systems will be installed on the roof.
- 14 square meters of parking space and 35 square meters of garages are planned under the building and the playground.
|
|
Developer's Other Projects |
|
Elitar Shin Development company presents you Bagrevand Residence multi-residential complex. The exclusive right of sale belongs to D.G.A. Realty. The complex is located in Jrvezh community of Kotayk region, adjacent to Bagrevand street. The area is quite quiet and free from excessive noise.
Construction Progress (78)
Buildings (2)
|
Construction Period |
2023 Apr - 2025 Dec |
|
Fire Protection System |
Yes |
|
Video Surveillance System |
Yes |
|
Panoramic View |
Yes |
Apartments Proposed Designs (20)
|
Construction Period |
2023 Apr - 2025 Dec |
|
Panoramic View |
Yes |