5 Small Hydropower Systems to be Constructed in Kotayk Region

As reported by press-center of Armenian government five small automated hydropower systems will be constructed in Kotayk region by Hov-Khache LTD. The company in 2010 constructed and put into operation Yotnaxbyur-Garni free-flow water line, which supplies with drinking and irrigation water Garni, Gheghard, Goght, Hatsavan, Geghadir and Vokchaberd villages. According to Hov-Khache agreement with the government, it will be allowed to make a deferred payment of VAT upon the import of turbine-generators till September 2014. The cascade of small hydropower systems is planned to put into operation in 2012.

read more

North-South Road Corridor Presented

Investment program (Program 1 and Program 2) of "North-South" road corridor was presented on August 10 in Yerevan. According to Press-center of the Ministery of Transport and Communications, total length of the road is about 556 kilometers, which will link the Black Sea and other european countries through Armenia and Georgia. Crossing Armenia's territory from the south to the north (Meghri, Kapan-Goris-Yerevan-Ashtarak-Gyumry-Bavra), the corridor will join the Georgian road. The program funding is divided into separate tranches and government has already signed a US$ 500 million investment agreement with Asia Development Bank. It should be noted, that the first loan agreement was signed on October 12, 2009, the second one this year on May 30. On August 2 the Ministery of Transport and Communications announced a tender for construction works of road sections Yerevan-Ashtarak (11,71 kilometers), Yerevan-Ararat (38 kilometers) and Ashtarak-Talin (42 kilometers). "North-South" road corridor investment program is planned to be completed in 2017.

read more

Qatar To Build US$ 500 Million Semi-Submerged Resort

As reported by worldconstructionnetwork.com, construction work is set to begin on a US$ 500 million semi-submerged resort named Amphibious 1000, on the Qatar coast. Designed by Italy-based company Giancarlo Zema Design Group, the resort will be situated in the centre of a marine reserve and will extend for one kilometre in a horizontal position. Divided into two sections of land and sea, the project includes residential buildings, offices, a central marine park, floating walkways and underwater marina galleries that all form a semi circle around the central tower, which hosts a panoramic restaurant. Sea part will house 4 giant hotels comprising underwater rooms replicating the look of super-yachts. The resort's land portion will be equipped with a museum, exhibitions and aquariums. Other features of the facility include floating walkways as well as a restaurant allowing glimpses of the surrounding landscape. The facility will also incorporate 80 self-contained floating suites known as Jellyfish. Every suite will encompass four stories while featuring an underwater aquarium lounge. The hotels will surround a central public welcome area comprising an interactive museum on water life, water exhibition galleries as well as a glass tunnel leading to the underwater observatory in the marine park's centre. The welcome area is linked via long arm-like structures to fitness centres, gardens and a special outdoor theatre adorned with a moving stage which opens out to the sea. The transportation of guests across the resort will be facilitated by hydrogen-powered aluminium yachts called Trilobis measuring 20 metres. The vessels will sport a steel hull complemented by a superstructure in aluminium and will possess underwater observatory zones.

read more

Dubai-Based Company Began Construction In Syria Despite The Unsafe Situation

Ski slope, started construction of its mixed-use Khams Shamat Touristic Development project in Syria even as the security situation there worsened. The Dubai-based developer began work on the US $1 billion development, which is located 17 kilometers west of the Syrian capital Damascus, the company said in an e-mailed statement on August 7. The mall builder on July 27 started laying the foundations for the first phase of the project, which will involve building hotels, shops, homes and offices within a 1.5 million square- meter area in the Yaafour district, according to the statement. "All necessary preparations required to proceed with the execution of the project have already been made," Waddah As reported by Bloomberg, Majid Al Futtaim Group, the shopping-mall developer that built Dubai's indoor El Solh, the company's regional head for Syria and Lebanon, said in the statement. That includes the allocation of project management and construction teams, he said. About 2,200 protesters have been killed in Syria since March in an uprising against the government of President Bashar al-Assad, according to the National Organization for Human Rights. More than 500 members of the security forces have also been killed, Deputy Foreign Minister Fayssal Mekdad told India's News X channel.

read more

Okhta Center Turned Into Lakhta Center

St. Petersburg's construction and architecture committee permitted the state-controlled Gazprom gas giant to build a skyscraper on the Gulf of Finland, the company's public and business center said on Friday. Gazprom owns a plot of land in the area and plans to build a 470-meter tall office and an entire business center, Lakhta Center, nine kilometers to the north of the city center. In mid July, a lower commission for land and construction recommended that the project be allowed. The official limit for buildings in the area is 27 meters tall but the architecture committee said the limit would be extended to 500 meters for the Gazprom project. The new Lakhta Center project will be built on an area of 140 thousand square meters by 2018, and is designed to be a self-sufficient mini-town outside the St. Petersburg residential area. The offices of the Gazprom Neft company, the oil arm of Gazprom, and other Gazprom subsidiaries will be at the center of the project. Earlier, Gazprom wanted to build Okhta Center with a 400-meter tall skyscraper on the Okhtinskaya Cape in central St. Petersburg. The decision caused protests from community and the company withdrew the project late last year and sold the plot of land.

read more